Here is my latest project after Many hours of work. We gutted the bathroom just before that nice little 19" storm and lost 14 hours of work time.
After rewiring, adding plumbing, dropping in a tub/ surround walls and sheetrocking over the imperfect framing(a plumbing vent that still stuck an inch past the wall joists at the ceiling) then spackling with 8 gallons of spackle over 4 days!!, we finally got the subfloor and durock in.
The lighting in there isn't the best yet, but I will need to paint before tiling, putting the light bar in and dropping the sink, toilet, med cabinet , wall cabinet , and all the towel rack type stuff in.
This is as wide as my digis got at 28mm on a 1D, but I have had a 19-35 on my nikon film burner for the whole job ;)